Tank Farm/Lot Expansion Project

Geography: Central Alberta
Industry: Oil & Gas
Materials: 40 mil LLDPE Geomembrane, Geotextile, Concrete Batten Attachment, 900 Pile boot Penetrations, Gusset Penetrations, and Containment Wall Attachment.
Duration: 11 Months

Project Description

Phase 1

Complete all 5 tank base liners that tied into a concrete tank base.  The liner extended out past the construction of a ring road to allow for both the construction of steel tanks and Phase 2 liner construction.

Phase 2

Extending the tank lot area liner out to a precast concrete wall including all the Pile Boot Penetrations with tie-ins to the Phase 1 liner.

Phase 3

Tie-in to precast concrete walls around 3 sides. The 4th side involved some ECI value-engineered solutions due to wall design.

outcome

The Project was a great success for the Owner along with both the Engineering firm and ECI.

lessons learned

Working closely and communicating daily with all stakeholders led to a project completed on schedule, on budget, and without safety incidents.